ASFINAG data as of 18/11, 02:08 (Vienna) for motorways and expressways in Upper Austria – active reports: 23 (closures/restrictions: 12, congestion: 0, roadworks: 10); additionally planned in the next 7 days: 17.
Only reports located in Upper Austria. The list refreshes automatically in your browser.
ATAustriaASFINAG DATA
SnapshotASFINAG data as of (Vienna)
Currently valid reports · Upper Austria 23
Closure / restrictionA8planned
Innkreis Autobahn
A8 Innkreis Autobahn: From Suben to Voralpenkreuz between interchange Wels and interchange Ende der A8 right lane is closed, at interchange Wels West the entry slip road is closed, 15.09.2026 07:00 - 01.07.2027 05:00, Generalsanierung.
Closure / restrictionA8planned
Innkreis Autobahn
A8 Innkreis Autobahn: From Voralpenkreuz to Suben between interchange Wels-Wirtschaftspark and interchange Voralpenkreuz closed, 17.11.2026 21:00 - 18.11.2026 05:00, Generalsanierung.
Closure / restrictionA1planned
West Autobahn
A1 West Autobahn: From Salzburg to Linz at interchange Seewalchen entry slip road closed, 17.11.2026 20:00 - 18.11.2026 05:00, Totalsperre.
A25 Welser Autobahn, Knoten Haid Richtung Wels, ASt Weißkirchen / Marchtrenk Ost Abfahrtsrampe, Rampensperre aufgrund von Instandhaltungsarbeiten, Voraussichtliche Dauer: 16.11.2026 07:15 - 21.11.2026 07:15
Closure / restrictionA25planned
Welser Autobahn
A25 Welser Autobahn: From Haid to Wels between interchange Weißkirchen / Marchtrenk Ost and interchange Wels Ost / Marchtrenk West new roadworks layout, 07.09.2026 05:00 - 10.09.2027 20:00, Lärmschutzmaßnahmen.
Closure / restrictionA9planned
Pyhrn Autobahn
A9 Pyhrn Autobahn: From Voralpenkreuz to St.Michael at interchange Windischgarsten left lane is closed, 17.09.2026 05:00 - 25.11.2026 20:00, Instandsetzung.
Closure / restrictionA7planned
Mühlkreis Autobahn
A7 Mühlkreis Autobahn: From Linz to Freistadt at interchange Muldenstraße, Bindermichl entry slip road closed, 23.11.2026 - 27.11.2026: Mo, Di, Mi, Do 20:00 - 05:00, Instandsetzung.
Closure / restrictionA9planned
Pyhrn Autobahn
A9 Pyhrn Autobahn: From Spielfeld to Voralpenkreuz at interchange Windischgarsten right lane is closed, 17.09.2026 05:00 - 25.11.2026 20:00, Instandsetzung.
Closure / restrictionA7planned
Mühlkreis Autobahn
A7 Mühlkreis Autobahn: From Knoten Linz to Freistadt between interchange Linz - Hummelhof and interchange VÖEST new roadworks layout, 02.10.2026 20:00 - 30.04.2027 05:00, Sicherheitsausbau.
A8 Innkreis Autobahn, Wels Richtung Voralpenkreuz, zwischen Wels West (km 11.2) und Knoten Voralpenkreuz (km 0.0), im Baustellenbereich, Tunnel Noitzmühle aufgrund von Instandhaltungsarbeiten gesperrt, Voraussichtliche Dauer: 15.09.2026 08:30 - 01.07.2027 05:00
A7 Mühlkreis Autobahn, Freistadt Richtung Linz, ASt Wiener Straße Abfahrtsrampe in Richtung Linz Zentrum, Rampensperre aufgrund von Instandhaltungsarbeiten
A7 Mühlkreis Autobahn, Linz Richtung Freistadt, ASt Wiener Straße Auffahrtsrampe aus Richtung Linz Zentrum, Rampensperre aufgrund von Instandhaltungsarbeiten, Voraussichtliche Dauer: 25.08.2026 04:45 - 16.05.2027 20:00
Breakdown / obstructionS10planned
Mühlviertler Schnellstraße
S10 Mühlviertler Schnellstraße: From Linz to Wullowitz at interchange Kefermarkt speed limit is 80 km/h, 12.11.2026 12:45 - 31.12.2026 13:45, Sonstige Behinderungen.
RoadworksA8planned
Innkreis Autobahn
A8 Innkreis Autobahn: From Suben to Wels at interchange Meggenhofen-Gallspach hard shoulder is closed, 17.11.2026 23:45 - 18.11.2026 05:30, Bauarbeiten durch Dritte.
RoadworksA8planned
Innkreis Autobahn
A8 Innkreis Autobahn: From Voralpenkreuz to Passau (D) at interchange Wels right lane is closed, 17.11.2026 20:00 - 18.11.2026 05:00, Bauarbeiten durch Dritte.
+8 more reports in the interactive list
Planned within the next 7 days 17
RoadworksA9planned
Pyhrn Autobahn
A9 Pyhrn Autobahn: From Voralpenkreuz to St.Michael between interchange Gleinkerau and interchange Spital/Pyhrn right lane is closed, 18.11.2026 07:00 - 18.11.2026 15:30, Entwässerungsarbeiten.
RoadworksA9planned
Pyhrn Autobahn
A9 Pyhrn Autobahn: From Spielfeld to Voralpenkreuz at interchange Klaus left lane is closed, 18.11.2026 07:00 - 18.11.2026 15:00, Arbeiten an den Betriebs- und Sicherheitseinrichtungen.
Closure / restrictionA25planned
Welser Autobahn
A25 Welser Autobahn: From Kn. Haid to Wels at interchange ÖBB-Terminal Wels exit slip road closed, 18.11.2026 19:00 - 19.11.2026 06:00, Kleinflächensanierung.
RoadworksA25planned
Welser Autobahn
A25 Welser Autobahn: From Haid to Wels between interchange ÖBB-Terminal Wels and interchange Wels Nord right lane is closed, 18.11.2026 19:00 - 19.11.2026 06:00, Kleinflächensanierung.
Closure / restrictionA8planned
Innkreis Autobahn
A8 Innkreis Autobahn: From Voralpenkreuz to Passau (D) at interchange Meggenhofen-Gallspach closed, 18.11.2026 19:45 - 18.11.2026 23:45, Bauarbeiten durch Dritte.
RoadworksA8planned
Innkreis Autobahn
A8 Innkreis Autobahn: From Voralpenkreuz to Passau (D) at interchange Wels right lane is closed, 18.11.2026 20:00 - 19.11.2026 05:00, Bauarbeiten durch Dritte.
RoadworksA8planned
Innkreis Autobahn
A8 Innkreis Autobahn: From Voralpenkreuz to Passau (D) at interchange Meggenhofen-Gallspach hard shoulder is closed, 18.11.2026 23:45 - 19.11.2026 05:30, Bauarbeiten durch Dritte.
RoadworksA8planned
Innkreis Autobahn
A8 Innkreis Autobahn: From Voralpenkreuz to Passau (D) at interchange Meggenhofen-Gallspach right lane is closed, 19.11.2026 05:00 - 19.11.2026 13:00, Kleinflächensanierung.
+9 more reports in the interactive list
Report text as published by ASFINAG (English feed).
Covers ASFINAG reports for motorways and expressways (A/S roads). Regional and municipal roads are not included. Congestion appears only when ASFINAG reports it – VerkehrJetzt does not calculate delay minutes.
Source: ASFINAG Content Portal · DATEX II · CC BY 4.0
Loaded server-side from the ASFINAG Content Portal. Access credentials are never sent to the browser.
Road network and main axes
The Linz area is Upper Austria’s hub: the West Autobahn A1 meets the Mühlkreis Autobahn A7, which runs straight through the city towards Freistadt. At the Voralpenkreuz near Sattledt the Innkreis Autobahn A8 to Passau (Suben border crossing) and the Pyhrn Autobahn A9 to Styria (Bosruck tunnel) branch off the A1.
How reports are assigned
Each ASFINAG report with coordinates is assigned to the federal state of the nearest of about 170 reference towns along motorways and expressways. A report right at a state border may therefore appear under the neighbouring state; reports without coordinates are only in the Austria-wide list. Regional and municipal roads are not included.
Model forecast at fixed points (state capital and motorway sections). Weather is not a road condition or a closure.
Point
Forecast now
Next 24 h
⚠
Linz
5.5 °CcloudyForecast valid for Wed 18/11, 02:00
Min / max: 4.6 / 11.5 °CPrecipitation: 5.3 mmWind: max. 33 km/h
–
Linz (Knoten Haid)
4.5 °CcloudyForecast valid for Wed 18/11, 02:00
Min / max: 4.3 / 13.5 °CPrecipitation: 4.3 mmWind: max. 31 km/h
–
Mondsee
6.3 °CcloudyForecast valid for Wed 18/11, 02:00
Min / max: 5.2 / 12.5 °CPrecipitation: 3.8 mmWind: max. 28 km/h
–
Unterweitersdorf
6.2 °CcloudyForecast valid for Wed 18/11, 02:00
Min / max: 5.8 / 11.1 °CPrecipitation: 4.3 mmWind: max. 34 km/h
–
Weather forecasts do not tell you whether a road is open, closed or requires snow chains. ASFINAG reports, road signs and official orders are authoritative. Official severe-weather warnings: GeoSphere Austria. GeoSphere Austria ↗
Weather: MET Norway Locationforecast 2.0 (model forecast, CC BY 4.0). Not a road-surface measurement and not an official warning. · Model run: Wed 18/11, 00:18
Frequently asked questions
Which motorways and expressways run through Upper Austria?
Which motorway border crossings are in Upper Austria?
Suben / Passau (A8 ↔ A3).
Do the reports for Upper Austria include regional roads?
No. The reports come from ASFINAG and cover only motorways and expressways (A/S roads). Regional and municipal roads are managed by the respective road authorities.